As called for in the original RGGI Memorandum of Understanding, the Participating States conducted a program review of the CO2 Budget Trading Programs.
The RGGI program review was a rigorous and comprehensive evaluation, supported by an extensive regional stakeholder process that engaged the regulated community, environmental nonprofits, consumer and industry advocates, and other interested stakeholders.
Amendments to the Model Rule were developed by the RGGI state staff as part of the Program Review. This effort was supported by an extensive regional stakeholder process that engaged the regulated community, environmental nonprofits, and other organizations with technical expertise.
Final Materials from the 2012 Program Review
Final Press Release
Final Model Rule and Program Recommendations
- RGGI 2012 Program Review: Summary of Recommendations to Accompany Model Rule Amendments
- Summary of Proposed Changes to RGGI Regional CO2 Allowance Budget
- Summary of RGGI Model Rule Changes
- Updated Model Rule
Final Economic Analyses
- REMI Economic Analysis of RGGI Model Rule Scenario
- Customer Bill Analysis of RGGI Model Rule Scenario
Final IPM Modeling (Assumptions, Reference Cases, and Policy Scenario)
- IPM Analysis of RGGI Model Rule Scenario
- Reference Case and Sensitivity Analyses Assumptions
- Reference Case and Sensitivity Analyses Results
Materials by Date
The following materials were presented in a series of stakeholder meetings during the 2012 Program Review. These are organized below according to the date of the meeting. Following each meeting, many written stakeholder comments were also submitted. These comments are enclosed here within ZIP files and grouped with the relevant meeting materials.
2013 Supplemental Materials | Format | Size | Date |
---|---|---|---|
REMI Economic Analysis of RGGI Model Rule Scenario | 410 KB | 6.3.13 | |
Customer Bill Analysis of RGGI Model Rule Scenario | 213 KB | 6.3.13 | |
Updated Forest Offsets Protocol | 1.12 MB | 6.13.13 | |
Updated Forest Offsets Protocol (Redlined Version) | 1.13 MB | 6.13.13 | |
Summary of Proposed Changes to RGGI Regional CO2 Allowance Budget | 579 KB | 11.21.13 | |
Updated (Final) 2013 Model Rule | 643 KB | 12.23.13 |
February 11, 2013 Webinar Documents | Format | Size |
Save the Date | 63 KB | |
Meeting Agenda and Logistics | 164 KB | |
Program Review Recommendations Summary | 156 KB | |
Summary of RGGI Model Rule Changes | 188 KB | |
Updated Model Rule | 628 KB | |
Updated Model Rule (Redlined Version) | 730 KB | |
Updated Forest Offsets Protocol | 1,190 KB | |
Updated Forest Offsets Protocol (Redlined Version) | 1,190 KB | |
Presentation: February 11th Webinar (Updated 2/14/2013) | 808 KB | |
REMI Economic Analysis | 1.29 MB | |
IPM Analysis of RGGI Model Rule Scenario (Revised 2/8/2013) | 304 KB | |
Data: IPM Electricity Sector Modeling Results 91 Cap Bank Model Rule | XLS | 455 KB |
Data: IPM Electricity Sector Modeling Results 91 Cap Alt Bank Model Rule | XLS | 455 KB |
Data: IPM Electricity Sector Modeling Results 91 Cap Bank | XLS | 455 KB |
January 8, 2013 Webinar Materials | Format | Size |
Save the Date | 37 KB | |
Meeting Agenda and Logistics | 171 KB | |
Presentation: ICF - Analysis of IPM Potential Scenarios | 806 KB | |
(Revised 1/14/2013) Presentation: Analysis Group - Economic Analysis of IPM Potential Scenarios | 169 KB | |
Draft IPM Electricity Sector Modeling Results (8 Cases) | ZIP | 689 KB |
DRAFT 2012 Reference Case and Sensitivity Analyses Assumptions Updates | 408 KB | |
Stakeholder Comments | ZIP | 2.1 MB |
November 28, 2012 Webinar Documents | Format | Size |
Save the Date | 136 KB | |
Meeting Agenda and Logistics | 46 KB | |
Presentation: 2012 Proposed IPM Potential Scenarios | 180 KB | |
Presentation: REMI Economic Analysis of RGGI IPM Potential Scenarios | 410 KB | |
Data: IPM Electricity Sector Modeling Results (91 Cap) (Revised) | XLS | 420 KB |
Data: IPM Electricity Sector Modeling Results (101 Cap ) (Revised) | XLS | 420 KB |
Stakeholder Comments (for both Nov. 20 and 28) | ZIP | 2.7 MB |
November 20, 2012 Meeting Documents | Format | Size |
Save the Date | 173 KB | |
Meeting Agenda and Logistics | 251 KB | |
Presentation: Program Review and IPM Potential Scenarios | 386 KB | |
Draft Model Rule Summary | 106 KB | |
Preliminary Draft Model Rule | 658 KB | |
Preliminary Draft U.S. Forests Offset Protocol | 1.05 MB | |
Presentation: Preliminary Draft Model Rule | 178 KB | |
Data: IPM Electricity Sector Modeling Results (106 Cap) (Revised) | XLS | 410 KB |
Data: IPM Electricity Sector Modeling Results (97 Cap) (Revised) | XLS | 409 KB |
October 18, 2012 Webinar Documents | Format | Size |
Webinar Logistics | 127 KB | |
Webinar Agenda | 320 KB | |
Presentation: Program Design Concepts | 349 KB | |
Stakeholder Comments | ZIP | 1.5 MB |
August 13, 2012 Webinar Documents | Format | Size |
Agenda & Logistics | 131 KB | |
Presentation: IPM Reference Case and Sensitivity Results | 161 KB | |
IPM Reference Case and Sensitivity Assumptions Document | 305 KB | |
Draft IPM Results (3 Cases, Revised) | ZIP | 256 KB |
Stakeholder Comments | ZIP | 236 KB |
July 12, 2012 Webinar Documents | Format | Size |
Agenda & Logistics | 58.1 KB | |
Presentation: IPM Reference Case and Sensitivity Assumptions | 449 KB | |
Stakeholder Comments | ZIP | 139 KB |
May 21, 2012 Stakeholder Documents | Format | Size |
Materials for Stakeholder Comment | 82.8 KB | |
Stakeholder Comments | ZIP | 1.5 MB |
March 20, 2012 Meeting Documents | Format | Size |
Data: IPM Electricity Sector Modeling Results (XLS) | ZIP | 961 KB |
Presentations: IPM Electricity Sector Modeling | 373 KB | |
Presentation: REMI Macroeconomic Modeling | 372 KB | |
Document: RGGI Program Operations Review for Stakeholder Comment | 95 KB | |
Agenda & Logistics | 106 KB | |
Stakeholder Comments | ZIP | 1.2 MB |
January 24, 2012 Meeting Documents | Format | Size |
Presentations on Flexibility Mechanisms (7 Presentations) | ZIP | 2.1 MB |
Agenda & Logistics for Learning Session on Flexibility Mechanisms | 130 KB | |
Announcement for Learning Session on Flexibility Mechanisms | 51 KB | |
Stakeholder Comments | ZIP | 720 KB |
October 11, 2011 Meeting Documents | Format | Size |
Presentations on Electricity Markets and Electricity Imports (6 Presentations) | ZIP | 1 MB |
Agenda for Learning Session on Electricity Markets and Electricity Imports | 84.9 KB | |
Notice of Learning Session on Electricity Markets and Electricity Imports | 76.4 KB | |
Stakeholder Comments | ZIP | 194 KB |
September 19, 2011 Meeting Supplemental Materials | Format | Size |
Notice of Stakeholder Meeting | 24 KB | |
Meeting Agenda and Logistics | 119 KB | |
Reference Case Assumptions | 444 KB | |
Draft Reference Case and Sensitivity Analyses Results | 321 KB | |
Presentation: Olga Chistyakova, Thomson Reuters Point Carbon | 502 KB | |
Presentation: Context Around RGGI Discussions, Michel Di Capua, Bloomberg New Energy Finance | 270 KB | |
Presentation: Cost Containment Mechanisms for RGGI, Karen Palmer, Resources for the Future | 169 KB | |
Stakeholder Comment: N. Jonathan Peress, Conservation Law Foundation | 478 KB | |
IPM Modeling Results (8 Cases) | ZIP | 608 KB |
Stakeholder Comments | ZIP | 3.9 MB |
November 12, 2010 Meeting Documents | Format | Size |
Notice of Stakeholder Meeting | 24 KB | |
Meeting Agenda | 108 KB | |
Draft White Paper - Relative Effects of Various Factors on RGGI Electricity Sector CO2 Emissions: 2009 vs 2005 | 792 KB | |
Report - Reserve Price Analysis | 767 KB | |
Presentation #1: Reference Case Assumptions and Results | 292 KB | |
Presentation #2: Sensitivity Analysis Assumptions and Results | 190 KB | |
Presentation #3: Federal Regulatory Sensitivity Assumptions and Results | 385 KB | |
Preliminary IPM Modeling Results (8 Cases and Assumptions Supplement) | ZIP | 779 KB |
Stakeholder Comments | ZIP | 9.7 MB |
September 13, 2010 Meeting Documents | Format | Size |
Notice of Stakeholder Meeting | 42 KB | |
Agenda and Logistics | 64 KB | |
Presentation Slides: Assumptions Development for IPM Modeling to Support RGGI Program Review | 200 KB | |
Background Slides and IPM Modeling | 250 KB | |
Additional Slides Presented on 9/13 | 100 KB | |
Draft Firm Capacity and Retirements Assumptions | XLS | 70 KB |
Stakeholder Comments | ZIP | 7.4 MB |